Eleven-year operation analysis and optimized management of medical linear accelerator in some hospital
10.19745/j.1003-8868.2023254
- VernacularTitle:某医院医用直线加速器11年运行情况分析
- Author:
Wen-Zhe LI
1
;
Yi-Wei HUANG
;
Wen-Jun LI
;
Li XU
;
Chen-Chen LIU
;
Meng ZHANG
;
Fang YUAN
Author Information
1. 新疆军区总医院放疗科,乌鲁木齐 830000
- Keywords:
medical linear accelerator;
running situation;
troubleshooting;
failure maintenance;
equipment management
- From:
Chinese Medical Equipment Journal
2023;44(12):74-77
- CountryChina
- Language:Chinese
-
Abstract:
The Elekta Synergy Linear Accelerator in some hospital from 2012 to 2022 were retrospectively analyzed in terms of operation,failure time distribution and failure of each system.Some countermeasures were put forward accordingly to decrease the failure rate and strengthen the training of relevant personnel's operation and maintenance.References were provided for effective management and operation of medical linear accelerators.