Construction and operational practices of national facility for translational medicine
10.3760/cma.j.cn113565-20240830-00210
- VernacularTitle:转化医学国家重大科技基础设施的建设和运行实践
- Author:
Yinyin CHEN
1
;
Chunjun ZHAO
;
Chaojun WEN
Author Information
1. 上海交通大学医学院附属瑞金医院 转化医学国家重大科技基础设施(上海),上海 200025
- Publication Type:Journal Article
- Keywords:
Translational medicine;
National facility;
Platform construction
- From:
Chinese Journal of Medical Science Research Management
2025;38(2):94-99
- CountryChina
- Language:Chinese
-
Abstract:
Objective:To analyze and summarize the operational mechanisms of the " National Facility for Translational Medicine (Shanghai)" (referred to as the Shanghai Facility), providing reference for the high-quality construction, management, and utilization of such facilities.Methods:Using the construction and operation of the Shanghai facility as a case study, this paper analyzed and discussed the facility's construction content, functional positioning, operational management systems, operational outcomes, in the meanwhile summarizing experience in construction and running of the facility.Results:Since the Shanghai facility was completed and officially put into operation in December 2020, significant achievements had been made in platform construction and operation.Conclusions:The successful operation of the Shanghai facility provides valuable experience for the construction of national major scientific and technological infrastructure in the field of translational medicine. In the future, its construction and management can be further improved through measures such as multi-channel fundraising, building-up of a multidisciplinary translational medicine talent team, and establishment of reasonable facility assessment criteria and talent evaluation standards.