Construction of performance management model based on comprehensive evaluation method with probability weight for emergency equipment
10.3969/j.issn.1672-8270.2025.10.021
- VernacularTitle:基于概率权数综合评价法的急救设备绩效管理模型构建
- Author:
Xinyi HE
1
;
Jing ZHANG
;
Zhenglin LOU
;
Jidong ZHANG
Author Information
1. 上海交通大学医学院附属仁济医院医学装备处 上海 200127
- Publication Type:Journal Article
- Keywords:
Probability weight method;
Comprehensive evaluation;
Emergency equipment;
Performance management;
Geometric mean
- From:
China Medical Equipment
2025;22(10):115-119,127
- CountryChina
- Language:Chinese
-
Abstract:
Objective:To construct a performance management model based on comprehensive evaluation method with probability weight,and to explore its application value in management for emergency equipment.Methods:A performance evaluation system was formulated by performance management model from three dimensions included operation quality,cost investment and social benefit of emergency equipment.Probability weight method was used to assign the index weight,and management countermeasures included engineering technical support,expenditure control and improvement of social benefit were formulated according to the comprehensive evaluation results.A total of 109 emergency equipment in clinical use at Renji Hospital,Shanghai Jiao Tong University School of Medicine from March 2022 to February 2024 were selected.The management method with conventional evaluation model(conventional evaluation management method)was adopted to manage 103 equipment during March 2022 and February 2023,and the management method with performance management model based on comprehensive evaluation method with probability weight(comprehensive evaluation management method)was adopted to manage 104 equipment(included the used 98 equipment that were managed by conventional evaluation management method at the first stage,and 6 new equipment)during March 2023 and February 2024.The operation quality and management cost of the two kinds of management methods for equipment were compared.A self-made questionnaire survey was conducted to investigate the performance evaluation of operators,who used equipment,for the two kinds of management methods in using equipment.Results:The average use rate,data integrity rate and pass rate of quality inspection of clinical emergency equipment of adopting the comprehensive evaluation management method were respectively(96.61±1.52)%,(97.74±1.91)%and(95.96±1.19)%,all of which were higher than those of adopting conventional evaluation management method.The average values of the alarm rate and the damage rate of the component and accessories of the system were respectively(1.24±0.83)%and(1.08±0.56)%,both of which were lower than those of the conventional evaluation management method.The differences of the above indicators were statistically significant(t=3.410,3.292,3.848,2.967,2.825,P<0.05).The average amplification of the management investment of respiratory therapy,diagnosis and treatment of electrocardiogram,rescue treatment,basic treatment and other management investment of emergency equipment were lower than those of the conventional evaluation management method,and the differences were statistically significant(t=3.533,3.487,4.002,3.317,2.726,P<0.05).The scores of operators who used equipment for configurations quantity,configuration quality and management level that adopted comprehensive evaluation management method were all higher than those that adopted conventional evaluation management method,and the differences were statistically significant(t=3.183,3.934,2.363,P<0.05).Conclusion:The performance management model based on the comprehensive evaluation method with probability weight can enhance the operational quality of clinical emergency equipment,and control the management cost of equipment,and improve the service level of equipment.