1.Medical equipment operation training in military hospital
Ting XIA ; Leihan LIU ; Fuxing GUO
Chinese Medical Equipment Journal 2015;(9):120-122
The practices of military hospital medical equipment operation training were introduced, and the problems were pointed out in training content, organization and support. Some suggestions were put forward from the aspects of field medical equipment development, training plan, post-based training and etc so as to enhance the supportability of field medical equipment.
2.Construction and application of storehouse for medical camp in emergency support brigade
Jiming ZHANG ; Cunhe LIN ; Ling WANG ; Hai YU ; Leihan LIU
Chinese Medical Equipment Journal 2004;0(09):-
The framed storehouse and the open rolling shutter door equipment are designed and manufactured for the infrastructure construction.The multipurpose and moved frame operating platform is designed and manufactured according to the demands of loading and unloading as a whole for part medical equipments.In this way,the shortage of the storehouse space is solved and the usual training and moving become easier.
3.Study on Unloading and Positioning of New Type Medical Shelter
Cunhe LIN ; Leihan LIU ; Ling WANG ; Junpeng TIAN ; Hongwei GONG ; Jiming ZHANG
Chinese Medical Equipment Journal 1989;0(01):-
Objective To study way of unloading and positioning of the new type medical shelter. Methods Through repeated testing and practical application, the ways of "3-lines" is used in the ground precession standardization. The first line is guard line of the left marginal of the shelter, the second is allocation line of the end part of the shelter and the third is front wheel alignment line of the whole unloading vehicles. Based on the lines, vehicles carrying shelters access to the ground in accordance with the order of three channel shelters ahead of five functional shelters. Results The real time of the shelter started is reduced to 35min, much lower than the time designed of 4h. Conclusion The application can be carried out precise positioning and improve the speed of the equipment spread.