Application of three risk assessment methods to noise risk assessment in an automobile foundry enterprise.
10.3760/cma.j.cn121094-20210109-00036
- Author:
Bei Bei XIE
1
;
Wei CHANG
1
;
Kun WU
2
;
Liang Liang GUO
2
;
Yong MEI
1
Author Information
1. School of Public Health, Wuhan University of Science and Technology, Hubei Province Key Laboratory of Occupational Hazard Identification and Control, WuHan 430065, China.
2. Shiyan Prevention and Treatment Center for Occupational Disease, Shiyan 442000, China.
- Publication Type:Journal Article
- Keywords:
Automobile foundry;
Noise, Occupational;
Risk assessment
- MeSH:
Automobiles;
Noise, Occupational/adverse effects*;
Occupational Exposure;
Occupational Health;
Risk Assessment/methods*
- From:
Chinese Journal of Industrial Hygiene and Occupational Diseases
2022;40(4):271-275
- CountryChina
- Language:Chinese
-
Abstract:
Objective: To explore the applicability of three different kinds of noise occupational health risk assessment methods to the occupational health risk assessment of noise exposed positions in an automobile foundry enterprise. Methods: In July 2020, the occupational-health risk assessment of noise-exposed positions was conducted by using the Guidelines for risk management of occupational noise hazard (guideline method) , the International Commission on Mining and Metals Guidelines for Occupational Health Risk Assessment (ICMM) method and the Occupational-health risk index method (index method) respectively, and the results were analyzed and compared. Results: Through the occupational health field investigation, the noise exposure level of the enterprise's main workstations was between 80.3 and 94.8 dB (A) , among which the noise of the posts of shaking-sand, cleaning and modeling was greater than 85 dB (A) ; The noise risk of each position was evaluated by the three methods, and the adjustment risk level was between 2 and 5 assessed using the guideline method, between 2 and 3 assessed using the index method, and 5 evaluated using the ICMM model. Conclusion: Each of the three risk assessment methods has its own advantages and disadvantages. The ICMM model has a large difference in value assignment, and values in the results are larger than expected. The evaluation results of the guideline method and the index method are consistent in some positions, there is certain subjectivity in the evaluation using the index method, and the guideline method is more objective.