Discussion on installation scheme of 3.0T high field magnetic resonance equipment in hospital
10.3969/J.ISSN.1672-8270.2017.04.041
- VernacularTitle:3.0T高场医用磁共振设备安装工程方案探讨
- Author:
Weiliang TIAN
;
Kaixi XU
;
Boguang ZHU
- Keywords:
Magnetic resonance;
Machine room;
Site preparation;
Magnetic field;
Electric;
Affect;
Radio frequency (RF) shielding
- From:
China Medical Equipment
2017;14(4):149-151
- CountryChina
- Language:Chinese
-
Abstract:
Objective: With the clinical application and popularization of magnetic resonance equipment, the installed amount of 3.0T high field magnetic resonance in the hospital was gradually increasing. This paper summarized the various technical factors involved in the installation of 3.0T high field MRI, and provided scientific and valuable reference for the installation and management of high field magnetic resonance equipment. Methods: During the installed process of GE discovery 3.0T magnetic resonance, to explore the correlative relationship among series of preparation work about installation of magnetic resonance, such as the selection of machine room, civil construction, shield construction and related electrical facilities and so on, and complete the connecting work among them. Results: Finally, the hospital has successfully completed machine room preparation for the 3.0T magnetic resonance, and has provided site guarantee for obtaining high-quality magnetic resonance images. Conclusion: In view of the special, importance and higher requirement for machine room of the magnetic resonance equipment, the seriously research and analysis should be applied and a coordinated mechanism of various type work should be established before the equipment is installed. During the construction process of machine room, enough consideration for detail in every aspect can provide guarantee for completing high-quality construction during the scheduled period, and achieve a satisfying effect.