Construction and operation status of management system of laboratories of schistosomiasis control institutions in Hubei Province
10.16250/j.32.1374.2016154
- VernacularTitle:湖北省血防专业机构实验室管理体系建立与运行现状分析
- Author:
Zhaohui ZHENG
;
Jun QIN
;
Li CHEN
;
Hong ZHU
;
Li TANG
;
Zuwu TU
;
Mingxing ZENG
;
Qian SUN
;
Shunxiang CAI
- Publication Type:Journal Article
- Keywords:
Schistosomiasis;
Laboratory;
Management system;
Hubei Province
- From:
Chinese Journal of Schistosomiasis Control
2016;28(5):519-522
- CountryChina
- Language:Chinese
-
Abstract:
Objective To analyze the construction and operation status of management system of laboratories of schistosomi?asis control institutions in Hubei Province,so as to provide the reference for the standardized detection and management of schis?tosomiasis laboratories. Methods According to the laboratory standard of schistosomiasis at provincial,municipal and county levels,the management system construction and operation status of 60 schistosomiasis control institutions was assessed by the acceptance examination method from 2013 to 2015. Results The management system was already occupied over all the labora?tories of schistosomiasis control institutions and was officially running. There were 588 non?conformities and the inconsistency rate was 19.60%. The non?conformity rate of the management system of laboratory quality control was 38.10%(224 cases)and the non?conformity rate of requirements of instrument and equipment was 23.81%(140 cases). Conclusion The management system has played an important role in the standardized management of schistosomiasis laboratories.