Working flow of installation and check & acceptance of 64-slice spiral CT in our hospital
10.3969/j.issn.1672-8270.2009.08.004
- VernacularTitle:我院大型医疗设备-64排CT安装及验收的流程管理
- Author:
Ximei HAN
;
Yi PENG
;
Hongyang ZHANG
- Publication Type:Journal Article
- Keywords:
Large scale medical equipment;
Installation;
Check & acceptance;
Working flow;
Management
- From:
China Medical Equipment
2009;(8):13-16
- CountryChina
- Language:Chinese
-
Abstract:
This paper introduces the working flow of the installation and the check & acceptance of the medical equipment.The maior working flow includes the following item.(1)the time of accepting contract.(2)Auditing contract.(3)confirming the arrival time of the equipment.(4)preparing fabricating yard for the equipment installation.(5)the actual time of the equipment arriving.(6)unpacking and inspecting.(7)checking accessories of the equipment.(81collecting the manual of the equipment.(9)the procedure information of the importing equipment.(10)checking the eligibility of the equipment.(11)the operation and the training of the maintenance.(12)the measuring and auditing of the equipment.(13)the maintenance of equipment time.The working flow contributes a lot to our equipment checking & acceptance.In this article,we summarize the experience of the checking &acceptance of the medical equipment.