Retrospective analysis on the maintenance of BJ-6B accelerator
10.3760/cma.j.issn.1004-4221.2010.06.022
- VernacularTitle:BJ-6B加速器维修保养回顾分析
- Author:
Xianfu LI
;
Yujun LUO
;
Bangxian TAN
;
Mi LIU
;
Jinwei ZHOU
;
Li XIE
;
Bin YU
- Publication Type:Journal Article
- Keywords:
Radiotherapy;
Accelerator;
Maintenance
- From:
Chinese Journal of Radiation Oncology
2010;19(6):555-558
- CountryChina
- Language:Chinese
-
Abstract:
Objective To study the maintenance of BJ-6B accelerator. Methods Analyzed retrospectively the maintenance record of BJ-6B accelerator, including phenomena, causes and handle from 2002 to 2009. Results In 231 records, there were motion-controlling 64, hand-controlling-pendant 20.modulator 41, anti-peak overload 36, charging overload 5. Flatness 7, mechanical 21, digital-display 20,others lie in magnetron power, water-cooling system, light-indicator system, dose-monitor system and wedge system. Motion-controlling system is the highest among those, followed by high-voltage modulator and mechanical system. Conclusions The down time for BJ-6B accelerator is low because of its perfect technology. To keep its stability in clinic, the hospital authorities should emphasize training of engineer for improving their maintenance ability. The engineer must be familiar with the circuit diagram, check the electric wire and machine unit on time and prepare unit for maintenance. The temperature and humidity in machine house must be controlled on demand. The engineer must pay attention to machine parameters when beam is on for avoiding the spark's damage to magnetron and accelerating-tube