A project plan for construction and cabling of picture archiving and communication system network.
- Author:
Min LUO
1
;
Xiaolin WANG
;
Song LUO
;
Wenyong LEI
;
Xuejian WANG
;
Hongyu WEN
;
Hongxing WU
Author Information
- Publication Type:Journal Article
- MeSH: Computer Communication Networks; instrumentation; utilization; Equipment Design; Hospital Information Systems; Radiology Information Systems; utilization
- From: Chinese Medical Journal 2003;116(5):645-649
- CountryChina
- Language:English
-
Abstract:
OBJECTIVETo determine a network solution to meet the network requirements of the heavy data flow, load balance, and potential network storms from expansion of picture archiving and communication system (PACS) application.
METHODSIntel Netstructure 480T Giga Switch was used as the main switch and connected to each building by fiber channel at 1 Giga speed to archive 100 MB/s to each port. At the same time, the in-dependence of the original network construction was physically kept. The layer 3 and 4 switchers were used as load balance to reduce the heavy load of the network, and all the cabling for PACS used the super CAT5 along with the Intel NetStructure 1520 to prepare for potential network storms.
RESULTSAn advanced intranet was set up to fully meet the high standard requirement of the PACS. The foundation for upgrading the whole network system to 1 Giga application was built to achieve sharing and transmission of images, information, and patient data within the hospital. The base was established for the standardized management of the hospital.
CONCLUSIONGood planning is the first step in setting up PACS, and the equipment forms the necessary platform to run PACS and all kinds of hospital information system (HIS). The networking construction is the foundation of e-hospital.