Study on the design of the programmed evaluation process and its effect in the management of medical equipment in the emergency department
10.3969/j.issn.1672-8270.2024.07.024
- VernacularTitle:程序化评估流程设计及其在急诊科医疗设备管理中的效果研究
- Author:
Liqin MIAO
1
;
Zhi ZHANG
;
Caiyun XU
;
Mei WANG
;
Zhizhong ZHANG
Author Information
1. 首都医科大学附属北京友谊医院急诊科 北京 100050
- Keywords:
Programmed evaluation process;
Emergency department equipment;
Fault warning;
Device Equipment management
- From:
China Medical Equipment
2024;21(7):139-143
- CountryChina
- Language:Chinese
-
Abstract:
Objective:To design a programmed evaluation process,and to explore its application effect in the management of medical equipment in emergency department.Methods:The information management platform was constructed based on IntelliJ IDEA and Java language with browser and server(B/S)architecture,a programmed evaluation process was designed to manage medical equipment in the emergency department.From 2021 to 2022,27 medical devices in use in the emergency department of Beijing Friendship Hospital,Capital Medical University were selected,the programmed evaluation process and the post-evaluation process were adopted respectively for management according to the different equipment management methods.A total of 800 equipment operation logs sampled were analyzed under the two management methods.The timeliness of equipment management,management effect and satisfaction scores of related management personnel were compared between the two management methods.Results:The average time consumption of equipment warning timeliness,timeliness of maintenance personnel's arrival and timeliness of proposed treatment methods in the programmed evaluation process management were(0.92±0.21)min,(5.43±1.08)min and(15.63±2.27)min,respectively,which were lower than those in post-evaluation process management method,the difference was statistically significant(t=13.810,16.893,16.554,P<0.05).The failure rate of 400 logs sampled by the programmed evaluation process management method was 2.75%(11/400),which was lower than that of the post-evaluation process management method,the regular maintenance completion rate was 99.75%(399/400),which was higher than that of the post-evaluation process management method,the difference was statistically significant(x2=18.841,10.778,P<0.05).The equipment maintenance time and equipment maintenance cost of the programmed evaluation process management were(9.32±1.18)days and CNY(201,600±50,500),respectively,which were lower than those of the post-evaluation process management method,and the difference was statistically significant(t=12.663,37.213,P<0.05).The satisfaction scores of maintenance engineers,medical staff and patients in equipment use management for the programmed evaluation process management were(97.25±2.44),(98.63±4.57)and(97.16±3.09),respectively,which were higher than the post-evaluation process management method,and the differences were statistically significant(t=21.284,8.206,5.933,P<0.05).Conclusion:The application of programmed evaluation process to the equipment management of emergency department of the hospital can effectively improve and make up for the loopholes and deficiencies in the conventional equipment management,improve the effect of equipment management,reduce the frequency of equipment failure,and ensure the safe and stable operation of equipment.