Hazard analysis and countermeasures of periodic electrical switching to medical equipment in hospital
10.3969/j.issn.1672-8270.2024.01.036
- VernacularTitle:医院周期性电工倒闸对医疗设备的危害分析及应对策略
- Author:
Huaiying ZHANG
1
;
Guo ZHAO
;
Kun HAN
;
Heng XU
Author Information
1. 首都医科大学附属北京儿童医院医学工程处 北京 100045
- Keywords:
Medical equipment;
Electrical switching;
Power outage;
Surge current;
Hazard analysis and risk assessment(HARA);
Deming cycle(PDCA)
- From:
China Medical Equipment
2024;21(1):184-188
- CountryChina
- Language:Chinese
-
Abstract:
Objective:To establish safety objectives and strategies for power distribution of medical equipment to minimize the hazard of electrical switching to medical equipment.Methods:Based on the Hazard Analysis and Risk Assessment(HARA)method,the equipment hazard factors analysis and risk assessment were conducted for electrical switching from the perspective of medical equipment safety management.The Deming Cycle(PDCA)closed-loop management process was adopted to formulate refined the medical equipment power distribution safety objectives and response strategies.Results:In 2023,a total of 6 equipment failures occurred during the two periodic electrical shutdown operations carried out in the hospital's power distribution room,which was significantly lower than the average of 20.4 failures caused by electrician shutdowns from 2018 to 2022,and zero failure in Level I load department and other high-risk areas.Conclusion:The objective and strategy of power distribution safety of medical equipment are highly targeted and implemented,which is an effective way to implement the life cycle fine management of medical equipment.